Today's activities: - HAM3 Annulus Ion Pump was restarted - The 1000 amu RGA's gate valve was leak checked - all is good - On BSC8, 2 pcs. of 16.5" blanks have been torqued (at the northern side), so there is only 1 left to be replaced (at the southern side) - The EX RGA was wrapped, and is ready for bakeout, which will happen tomorrow - EX pumpdown status: it is at 1.1E-7