TITLE: 02/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: LVEA Laser Hazard all day today. Vent work today was in HAM6 and HAM7.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
17:44 | SAF | LVEA is Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | 10:22 |
16:21 | FAC | Karen, Kim | LVEA | y | Tech clean | 16:59 |
16:21 | VAC | Jordan | LVEA | y | Check on equipment | 16:29 |
16:23 | FAC | Chris | LVEA, Xarm, Yarm | - | Pest control | 17:28 |
16:36 | SQZ | Sheila, Naoki, Julian, Camille, Rahul | HAM7 | YES | HAM7 alignment | 20:00 |
16:54 | SEI | Jim, Tony, Micheal, Neil, Shoshana | EX | n | Installing remote BRS adjuster | 18:37 |
17:00 | FAC | Kim | EX, MX | n | Tech clean | 19:00 |
17:09 | FAC | Randy | LVEA - WB | YES | Scissor lift/crane work | 18:39 |
17:09 | FAC | Mitch | EX, EY | n | Dustmon FAMIS | 18:04 |
17:16 | VAC | Jordan | EX | n | RGAing | 20:16 |
17:24 | EE | Fil | EY, then EX | n | EY cable pulling, EX BRS work | 19:30 |
17:46 | TCS | Jason, TJ | LVEA | YES | Checking for leaks & turning on TCSX | 20:22 |
17:55 | FAC | Karen | MY | n | Tech clean | 18:55 |
18:26 | LAS | Travis | LVEA | YES | Hooking up leak detector | 19:35 |
19:23 | VAC | Gerardo | HAM Shack | n | Setting up purge air system | 23:37 |
19:30 | EE | Fil | EX, then EY | n | EX BRS feedthrough, EY cables part 2 | 22:41 |
19:58 | PCAL | Tony | PCal Lab | y(local) | Getting parts | 20:05 |
20:58 | PEM | Ryan C | LVEA | yes | Check out dustmons | 21:18 |
21:03 | SQZ | Naoki | LVEA HAM7 | yes | Open gate valve | 21:28 |
21:17 | VAC | Janos | LVEA | yes | Check out a pump | 23:59 |
21:19 | VAC | Jordan | EX | n | RGA con't | 22:01 |
21:24 | TCS | TJ, Jason | LVEA | yes | TSCX work | ongoing |
21:37 | SEI | Tony, Jim, Shoshona, Michael, Fil | EX | n | BRS work | ongoing |
21:45 | OMC | Rahul, Naoki, Kieta | LVEA HAM 6 | yes | OMC work | ongoing |
22:00 | IAS | Ryan C | LVEA | yes | Check out Faro | 22:03 |
22:24 | VAC | Travis | LVEA | yes | Disconnect pump | 22:43 |
00:02 | VAC | Jordan | EX | n | RGA | ongoing |