TITLE: 02/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: Maintenance
Wind: 2mph Gusts, 0mph 5min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.30 μm/s
QUICK SUMMARY: The LVEA is still laser hazard with some more HAM7/6 work planned today.