WP 11672
Entry of work done earlier this week
ECR E2200448 1/5/2024 – EX
In support of the installation for centering the BRS by picomotor, a DB9 cable was pulled from ISCTEX (picomotor driver) to the BRS enclosure. Breakout cable D2400020 breakouts the fifth channel from the DB25 picomotor cable.
ECR E2300367 1/5/2024 -1/6/2024 EX/EY
Network and power cables pulled from the SUS-R1/FAC-R1 racks to the Oplever pylon. Part of the installation for remote centering of the Oplevers. Network and power cables terminated. Network cable to be connected to the Beckhoff CU1128 hub.