Reports until 16:41, Wednesday 07 February 2024
H1 CDS
filiberto.clara@LIGO.ORG - posted 16:41, Wednesday 07 February 2024 (75773)
BRS/Oplever Cabling at End Stations

WP 11672

Entry of work done earlier this week

ECR E2200448 1/5/2024 – EX

In support of the installation for centering the BRS by picomotor, a DB9 cable was pulled from ISCTEX (picomotor driver) to the BRS enclosure. Breakout cable D2400020 breakouts the fifth channel from the DB25 picomotor cable.

ECR E2300367 1/5/2024 -1/6/2024 EX/EY

Network and power cables pulled from the SUS-R1/FAC-R1 racks to the Oplever pylon. Part of the installation for remote centering of the Oplevers. Network and power cables terminated. Network cable to be connected to the Beckhoff CU1128 hub.