TITLE: 02/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Today's main activity was closing out HAM6 (more specifically--being able to steer the OMC trans beams out of the chamber (after the installation of the modified OMC shroud plate)---the beam they worked with was very faint and hard to see (most of the LVEA lights needed to be off for this work!). LVEA was then transitioned to SAFE, and then HAM6 ISI was unlocked and balanced for SUS transfer functions.
There was wind fence work and lots of VAC team work as well.
LOG:
- 1555 LVEA technical cleaning (karen,kim)
- 1653 karen out, 1700 kim out
- 1628-1638 tcs chiller FAMIS check (corey)
- 1639-1115 Wind Fence work (chris, randy, mitch, jim)
- 2056-2301 Afternoon work (randy, mitch)
- 1640-1648 purge air measurement (jordan)
- 1657-1955 HAM6 OMC shroud, alignment, and closeout (betsy, rahul, keita)
- 2104 Resumption for afternoon with sheila joining the above team.
- This work was mostly complete around 2245!
- 1703-1745 EX rga checks + start BRS pump down (jordan, gerardo)
- 1709 Climbing around EY for fiber CDS network upgrade (fil)
- 1719 Checking out logistics of BSC8 feedthrough (a 3IFO feedthru stored there & to be swapped with a blank eventually) (travis)
- 1727-1757 Look at SQZ table (daniel.nutsinee)
- 1735 Erik mentioned making changes to Control Room FOMs via work permit over the coming days.
- 1758-1903 MX bathroom lights (ken)
- 1802-1950 FARO work in West Bay (jason)
- 1819 RyanC joining
- 2124-2308 Afternoon work (jason) + 2132 ryanC joining
- 1827 FCES cleanroom checks (richard.gerardo)
- 1907-1910 Checking on Top Gun in Cleaning Room (chris)
- 1909-1947 BRS pumpdown check (jordan)
- 1925-1931 Checking HAM6 status and ITM SEI sensor (jim)
- 2002 HAM8 WD trip
- 2036 Cabling work at FCES (ken)
- 2123-2244 Investigating BRS pressure at EX (michael, shoshana, neil, austin)
- 2256-2330 Returning to EX to check BRS (michael, shoshana, neil, austin
- 2127 Taking VAC photos at HAM7 (gerardo, jordan)
- 2129-2245 EX Mech Fan room (ken)
- 2130-2154 Delivering parts + taking photos (tj)
- 2138-2308 RGA work at FCES (jordan.gerardo)
- 2145-2159 Running battery out to Betsy (travis)
- 2225-2144 Checking up on HAM6 team (richard)
- 2244-2252 Transitioning LVEA to laser SAFE (tj)
- 2256 VAC checks in LVEA (janos, travis)
- 2307 Balancing HAM6 ISI (jim.mitch)
- 2314-2331 Beer garden trip (richard, gerardo)
- NEXT: Once HAM6 is balanced---> SUS crew (Rahul, Austin, Oli, Ibrahim) will jump on running transfer functions.