LHO General
corey.gray@LIGO.ORG - posted 16:01, Thursday 08 February 2024 (75780)
Thurs DAY Ops Summary

TITLE: 02/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Today's main activity was closing out HAM6 (more specifically--being able to steer the OMC trans beams out of the chamber (after the installation of the modified OMC shroud plate)---the beam they worked with was very faint and hard to see (most of the LVEA lights needed to be off for this work!).  LVEA was then transitioned to SAFE, and then HAM6 ISI was unlocked and balanced for SUS transfer functions.

There was wind fence work and lots of VAC team work as well.
LOG: