Reports until 07:58, Monday 12 February 2024
H1 General
ryan.crouch@LIGO.ORG - posted 07:58, Monday 12 February 2024 (75818)
OPS Monday day shift start

TITLE: 02/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 7mph Gusts, 5mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.33 μm/s
QUICK SUMMARY: