posted 11:58, Monday 12 February 2024 (75819)
OPS Monday day shift update
- HAM7 closeout work
- EE grounding loop checks, finished
- Beam diverted checked
- Irises removed
- SUS Transfer functions, will be run after SEI TFs finish
- SEI ISI locking, finished
- SEI transfer functions ongoing
- VAC EX RGA, ongoing
- Corner station is being prepped for the pumpdown by VAC team
- Site crane inspections, the ends have been inspected I believe and the LVEA has been done