H1 General (SEI, VE)
ryan.crouch@LIGO.ORG - posted 16:00, Monday 12 February 2024 (75820)
OPS Monday day shift summary

TITLE: 02/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The HAM7 doors are ready to be put back on, the CS pumpdown has begun, and EndX & HAM8 are being prepped to be vented.

17:59UTC SUS ZM5 WD trip, LVEA RED pressure alarm 18:30UTC, a few PSL anteroom yellow dust alarms throughout the morning/early afternoon then several red alarms around 22-23UTC.

21:12UTC ISI HAM7 WD trip, maybe from Gerardo turning down the purge air? ISI HAM5 & 7 tripped a few minutes later 21:18UTC and the motion was too high to untrip for a bit (~ 4 minutes), probably from the VAC teams work, sudden changes in pressure? Tagging VE, SEI. They retripped 2 minutes after I reset them after the motion look like it had calmed down. I'm going to leave them tripped for now.

21:51UTC the CS pumpdown started!

LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    

Start Time System Name Location Lazer_Haz Task Time End
15:30 FAC Kim & Karen LVEA N Tech clean 16:16
16:04 FAC Contractors EndY then X N Crane inspection 19:07
16:16 FAC Ken LVEA N Check pump 17:41
16:58 VAC Travis LVEA N Vac checks 17:17
17:15 SUS Rahul LVEA, HAM7 N HAM7 checks 18:35
17:17 VAC Travis EndX N Check on RGA 17:50
17:28 EE Fil LVEA, mech rm N HAM7 grounding checks, SUS to SAFE HAM7 19:40
17:40   Camilla, Betsy HAM7 N Closeout work, Betsy out @ 17:51UTC 17:54
17:50 VAC Gerardo LVEA N Check viewports are covered, pumpdown prep 19:09
17:50 EE Ken EndX then LSB N Lights 23:23
17:53 FAC Karen LVEA n Tech clean 18:12
18:00 VAC Jordan LVEA N Join Gerardo 19:09
18:31 VAC Travis EndX N RGA 23:11
18:34 FAC Karen EndY N Tech clean 19:41
18:38 FAC Richard LVEA N Talk with Vac & Fil 19:38
18:43 SUS Rahul LVEA N Check with Fil 18:48
19:01 SUS Rahul LVEA, HAM7 N Adjust BOSEM flag 19:15
19:17 SEI Jim LVEA, HAM7 N unlock ISI 19:47
19:17 SQZ Camilla LVEA N Check beam diverter 19:49
19:47 FAC Chris + contractors LVEA N Crane inspection 19:57
19:48 FAC Tyler FCES N Check equipment 19:50
19:48 SEI Jim CR N HAM7 transfer functions 20:32
19:49 SQZ Camilla & Julien FCES N Check SQZT8 20:43
20:36 SUS Rahul CR N SUS H7 transfer functions 22:36
20:53 SEI Jim EX, EY N EX - check BRS, EY - wind fence 23:13
21:07 VAC Jordan LVEA N Prep for pumpdown 21:51
21:11 VAC Gerardo LVEA N Join Jordan 21:51
21:51 VAC Garardo, Janos, Jordan LVEA N Start CS pumpdown (excluding HAM7), Gerardo out 23:10UTC Ongoing
23:23 EE Ken EndX N Move lift from EndX to EndY Ongoing
23:26 EE Fil FCES N Disconnect SQZT8 Ongoing