HAM7 close-out exit check list

Given below are the list of things I did in HAM7 to prepare for the close out of the chamber.

- Took particle counts outside and inside the chamber and they were zero (inside chamber) and few tens (outside chamber).

- Removed the two irises from the chamber and handed it over to Camilla (wrapped and bagged).

- ZM4 & ZM5: checked their pitch adjuster is locked, checked their dog clamps, checked all the EQ stops, centered the BOSEMs and took transfer function measurements - they look good.

- Confirmed that all wiring appears properly secured and is free of the beam path.

- Placed a silicon wafer inside the chamber on the ISI table.

- Removed all tools from the chamber (checked it twice).

- Took pictures - attached below.

Currently Fil is performing ground loop checks and Jim is un-locking the ISI.

We will be ready to put the doors once SEI and SUS transfer function measurements comes out healthy.

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 08:17, Tuesday 13 February 2024 (75835)EPO

Tagging EPO for these HAM7 closeout photos.