Given below are the list of things I did in HAM7 to prepare for the close out of the chamber.
- Took particle counts outside and inside the chamber and they were zero (inside chamber) and few tens (outside chamber).
- Removed the two irises from the chamber and handed it over to Camilla (wrapped and bagged).
- ZM4 & ZM5: checked their pitch adjuster is locked, checked their dog clamps, checked all the EQ stops, centered the BOSEMs and took transfer function measurements - they look good.
- Confirmed that all wiring appears properly secured and is free of the beam path.
- Placed a silicon wafer inside the chamber on the ISI table.
- Removed all tools from the chamber (checked it twice).
- Took pictures - attached below.
Currently Fil is performing ground loop checks and Jim is un-locking the ISI.
We will be ready to put the doors once SEI and SUS transfer function measurements comes out healthy.
Tagging EPO for these HAM7 closeout photos.