TITLE: 02/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:02 | FAC | Chris. Crane Inspection Person | LVEA | N | Crane Inspection | 23:01 |
16:03 | FAC | Kim. Karen | LVEA, Optics Lab, Vac Prep Lab | N | Technical Cleaning | 16:47 |
16:04 | FAC | Ken | LVEA Entryway | N | Lights | 22:02 |
16:10 | FAC | Tyler | LVEA | N | Crane Inspection Inspection | 18:06 |
16:12 | VAC | Gerardo, Jordan | LVEA | N | Restart Pumpdown | 18:13 |
16:28 | VAC | Travis | LVEA (HAM7) | N | Door Prep | 21:27 |
16:44 | FAC | Kim | EX | N | Technical Cleaning | 17:44 |
16:49 | FAC | Karen | EY | N | Technical Cleaning | 17:49 |
17:27 | FAC | Richard | LVEA | N | Activity Status Check | 18:27 |
17:52 | FAC | Randy, Eric | LVEA (HAM7) | N | HAM7 Doors | 19:24 |
18:16 | VAC | Gerardo, Jordan | LVEA (HAM7) | N | HAM7 Doors | 21:30 |
18:18 | FAC | Karen | FCES (HAM8) | N | Technical Cleaning | 19:18 |
18:24 | SUS | Jason, Ryan C | LVEA (Biergarten) | N | Taking measurements | 18:47 |
18:29 | CDS | Patrick | OSB | N | Updating vac medm screens | 20:32 |
19:23 | SUS | Betsy | LVEA | N | Task Check-up | 19:39 |
19:24 | SUS | Randy | HAM7 | N | HAM7 Doors | 21:23 |
19:34 | CDS | Dave | MSR | N | CDS Week Prep | 20:23 |
19:56 | CDS | Dave | EX, MX | N | CDS Week prep | 20:36 |
21:14 | FAC | Tyler | EY | N | Wind Fence Progress Check-Up | 23:14 |
21:59 | OPS | TJ | LVEA | N | Labeling + Storing | 22:16 |
23:17 | VAC | Gerardo | EX | N | Dew Point Meter Pickup | 23:54 |
23:38 | VAC | Janos | EY | N | AUX Cart | 23:51 |
23:55 | VAC | Jordan | LVEA (HAM7) | N | HAM7 Closeout | 00:55 |