TITLE: 02/14 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 11mph Gusts, 9mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.34 μm/s
QUICK SUMMARY:
Fire Dept has 2 pickups and 2 Engines down X arm for Burning tumbleweed with Tyler.
Eric and Randy are already heading down to EY for Wind fence work.
HAM7 Door has been closed. and Vacuum team will likely be trying to start the prepareing for pump down today.