Reports until 12:24, Wednesday 14 February 2024
H1 TCS
camilla.compton@LIGO.ORG - posted 12:24, Wednesday 14 February 2024 (75856)
TCS CO2 Cooling Pipes Inspection - New bi-annual FAMIS task

Updated T2400046 Googledoc. No leaks, flowmeters look good.

There 3 places where the pipes are not in their nominal 2x2 configuration: (A) before the drop down the the LVEA floor, (B) under the beamtube, (C) under HAM4. The pipes are also drooping in the longer stretch in the mechanical room. TJ is ordering more clic32 clamps that we plan to better support the pipes with. Also noticed a seemly unused metal bracket under BSC3, will check with SEI before removing. 

New FRS prompted by FRS 30283, plan to complete bi-annually by the TCS team.

Images attached to this report