TITLE: 02/15 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Fire Dept cam and burnt all the Tumble weeds alog X arm.
Fire pump on 20:47 UTC alarm went off because the Fire trucks are being refilled.
HAM7 pump down was indeeed started
Camera SHG-Trans is now working again
Fire on Xarm is kinda still smoldering and Hanford FD is aware of this.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:06 | FAC | Randy & Eric | EY Wind Fence | No | Wind fence repair | 20:06 |
| 16:07 | Fire | Fire Dept & Tyler | X arm | No | Tumbleweed eradication. | 22:13 |
| 16:28 | VAC | Jordan & Gerardo | LVEA HAM7 | No | Checking on HAM7 Vac system | 20:28 |
| 16:38 | FAC | Kim & Karen | HAM Shaq | N | Technical Cleaning | 19:38 |
| 16:46 | FAC | Chris | HAM Shaq | No | Cleaning the tops of high places for Kim & Karen. | 19:42 |
| 17:10 | TCS | Camilla | LVEA & Mechanical rm | N | Walking the Chiller Lines | 18:00 |
| 18:14 | SQZ | Nutsine & Daniel | SQZT0 | LOCAL HAZ | SQZT0 Work in LOCAL LASER HAZARD | 21:14 |
| 19:36 | VAC | Travis | LVEA HAM7 | No | Vacuum work | 21:36 |
| 19:36 | SQZ | Naioki | SQZT0 | LOCAL HAZ | SQZer Work | 21:36 |
| 19:44 | SQZ | Julian & Sheila | Optics Lab | yes(local) | Optics harware | 21:37 |
| 21:02 | Vac | Jordan Gerardo | LVEA Ham7 | No | Vacuum work Gerardo out first | 01:02 |
| 21:02 | EE | Fil | LVEA SQZT0 | No | Tracing a camera Cable. | 21:37 |
| 21:39 | Vac | Tyler | HAM7 | No | Vacuum work | 21:43 |
| 22:22 | SQZ | Sigg, Naoki, Nutsinee | SQZT0 | Local LASER HAZ | SQZer work with new SQZT0 Cam | 23:21 |
| 22:52 | vac | Travis, Janos | EX & Ey | No | Vacuuming air out of chambers | 22:52 |
| 23:44 | Vac | Travis | LVEA | No | Checking on Jordan | 23:55 |