Displaying report 1-1 of 1.
Reports until 16:23, Thursday 15 February 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:23, Thursday 15 February 2024 (75870)
Ops Day Shift End

TITLE: 02/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Pumpdown efforts continue, SQZ table work created a local hazard in the East bay.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:02 FAC Karen, Kim LVEA n Tech clean 17:03
16:03 FAC Ken OSB/LVEA rec. n Light changes 23:44
16:39 VAC Gerardo, Jordan LVEA n Start HAM7 pumpdown, continue corner 19:14
17:01 FAC Randy FCES n Vent prep 21:01
17:27 CDS Fil LVEA-BG n Cable pulling in beir garten 00:47
17:53 FAC Karen MY n Tech clean 18:34
18:01 IAS Jason, Ryan C LVEA n Surveying 19:44
18:09 SQZ Nutsinee, Daniel, Naoki LVEA - SQZ LOCAL SQZ table work, LOCAL HAZARD 23:58
18:14 SEI Jim, Tony EX n BRS adjustment 19:34
18:35 FAC Kim H2 elec n Tech clean 18:57
18:57 FAC Karen, Kim FCES n Tech clean 19:44
19:00 VAC Gerardo, Jordan FCES n RGA scan 20:14
19:27 FAC Eric MY n Check on heating coil 19:58
21:33 IAS Jason, Ryan C LVEA n Surveying 00:06
21:39 FAC Randy LVEA n Move orange scissor lift to receiving 23:25
22:01 VAC Gerardo, Jordan LVEA n Leak checking near HAM5 01:11
22:47 ISC Julian Opt Lab n Optics lab SHG 23:36
22:59 FAC Ken EY n Grab scaffolding 23:09
23:20 SQZ Camilla LVEA local Check in with other squeezers 23:33
Displaying report 1-1 of 1.