TITLE: 02/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Pumpdown efforts continue, SQZ table work created a local hazard in the East bay.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:02 | FAC | Karen, Kim | LVEA | n | Tech clean | 17:03 |
16:03 | FAC | Ken | OSB/LVEA rec. | n | Light changes | 23:44 |
16:39 | VAC | Gerardo, Jordan | LVEA | n | Start HAM7 pumpdown, continue corner | 19:14 |
17:01 | FAC | Randy | FCES | n | Vent prep | 21:01 |
17:27 | CDS | Fil | LVEA-BG | n | Cable pulling in beir garten | 00:47 |
17:53 | FAC | Karen | MY | n | Tech clean | 18:34 |
18:01 | IAS | Jason, Ryan C | LVEA | n | Surveying | 19:44 |
18:09 | SQZ | Nutsinee, Daniel, Naoki | LVEA - SQZ | LOCAL | SQZ table work, LOCAL HAZARD | 23:58 |
18:14 | SEI | Jim, Tony | EX | n | BRS adjustment | 19:34 |
18:35 | FAC | Kim | H2 elec | n | Tech clean | 18:57 |
18:57 | FAC | Karen, Kim | FCES | n | Tech clean | 19:44 |
19:00 | VAC | Gerardo, Jordan | FCES | n | RGA scan | 20:14 |
19:27 | FAC | Eric | MY | n | Check on heating coil | 19:58 |
21:33 | IAS | Jason, Ryan C | LVEA | n | Surveying | 00:06 |
21:39 | FAC | Randy | LVEA | n | Move orange scissor lift to receiving | 23:25 |
22:01 | VAC | Gerardo, Jordan | LVEA | n | Leak checking near HAM5 | 01:11 |
22:47 | ISC | Julian | Opt Lab | n | Optics lab SHG | 23:36 |
22:59 | FAC | Ken | EY | n | Grab scaffolding | 23:09 |
23:20 | SQZ | Camilla | LVEA | local | Check in with other squeezers | 23:33 |