LVEA is STILL in LASER HAZARD
Primary Ongoing Activities
- CDS Work is done in EX, MX and is planning to begin FCES after lunch
- Initial plan was EY/MY after lunch but re-coordinated to FCES.
- HAM8 pump is ongoing
- SQZT work is ongoing
Control Room Log (02/20) so far..
- 16:00 SUSEX and ISI to safe states
- 16:30 Dolphin EX fencing from ctrl rm
- Had to disable long range switch that supports EY, EX so EY no longer communicating with End Station
- 17:00 UTC ISI EX Stage 1,2 watchdog tripped - CDS Work ongoing
- 17:00 UTC SEI EX SW watchdog tripped
- 17:57 UTC HAM8 SEI set to offline (in prep for work)
- 18:39 -
- Dave, MX
- Fil, Tony, Jonathan, Ryan S, EX
- 19:28 UTC - Xarm is Done - Moving to FCES after lunch