Reports until 16:06, Tuesday 20 February 2024
H1 General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:06, Tuesday 20 February 2024 - last comment - 09:10, Wednesday 21 February 2024(75899)
OPS Day Shift Summary

TITLE: 02/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Primary Ongoing Activities

  1. CDS Work is unfinished (facing some delays that started with the last switch they went to in the mechanical room).
  2. HAM8 Vent is done
  3. SQZT work is ongoing

Control Room Log (02/20) so far..

 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:22 SAF LVEA is Laser HAZARD LVEA Yes LVEA is Laser HAZARD 03:59
16:23 VAC Gerardo, Jordan LVEA Yes Vacuum Checkup 16:40
16:46 CDS Fil, Ryan S EX N CDS Work 18:21
16:47 CDS Tony, Jonathan EX N CDS Work 18:21
16:53 CDS Erik Control Rm N Dolphin Fencing EX 17:13
17:01 VAC Jordan, Janos, Gerardo FCES N HAM8 Vent 20:18
17:07 FAC Karen EY N Technical Cleaning 17:55
17:07 VAC Kim EX N Technical Cleaning 17:45
17:29 SQZ Camilla, Vicky FCES N Move SQZT8 Out of the way 18:29
17:44 FAC Kim FCES N Technical Cleaning 18:44
17:45 SQZ Nutsinee, Naoki LVEA Yes SQZT Work 20:15
17:55 EE Marc, Fernando CER Mezzanine N Looking for a temp gun 18:00
18:00 EE Marc H2 Building N Looking for a temp gun 18:03
18:17 FAC Chris FCES N Helping tech clean 21:13
18:21 CDS Tony, Jonathan, Fil, Ryan S, Dave MX, EX N CDS Work 19:28
18:38 SQZ Daniel LVEA Yes SQZ Work 20:15
18:57 EE Marc LVEA Yes Checking on activity 19:17
19:23 FARO Ryan C LVEA Yes Water level check 19:34
19:29 CDS Tony., Jonathan, Ryan S, Dave FCES N CDS Work 20:37
19:48 CC RyanC CER N Handheld DM checks 19:51
20:21 VAC Janos LVEA Yes Tool Pickup 20:28
20:29 SUS Jim EX N BRS Centering 21:14
20:38 CDS Tony, Jonathan, Dave EY, MY N CDS Work 22:40
21:01 EE Marc, Jabari MY N Parts 22:00
21:07 VAC Jordan, Gerardo, Janos, Travis FCES N HAM8 Vent 22:19
22:08 CDS Ryan S, Fil EY N CDS Work 22:08
22:20 EE Fil FCES N Cable Repair 23:16
22:25 VAC Janos, Gerardo LVEA Yes Tubopump/Vacuum Stuff 00:04
22:42 CDS Tony, Jonathan, Dave Mechanical Room N CDS Work 23:42
23:12 FARO Ryan C LVEA Yes Faro prep for tomorrow 23:22
23:17 EE Fil LVEA Yes Terminating Beckhoff network cables 00:17
23:23 TCS Ibrahim Mech Room N Check TCS chillers 23:52
Comments related to this report
jonathan.hanks@LIGO.ORG - 09:10, Wednesday 21 February 2024 (75910)
The issue we had with sw-mech-aux appears to be an issue with the fiber.  The fiber run is not capable of reliably running 10G at its current distance.  I replaced the link with a 1G link and it appears to be stable with the new switch.