Reports until 08:02, Wednesday 21 February 2024
H1 General
ibrahim.abouelfettouh@LIGO.ORG - posted 08:02, Wednesday 21 February 2024 (75906)
OPS Day Shift Start

TITLE: 02/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 2mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.29 μm/s
QUICK SUMMARY:

Expecting majority of control room to be down due to CDS work today.