TITLE: 02/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
CDS work has largely concluded and suspensions/seismic have been put back into their normal GRD settings.
With some exceptions:
Additionally, the LVEA is now LASER SAFE
LOG:
Time In (PT) | Time Out (PT) | System | Name | Location | Lazer Hazard | Task |
7:50 | 8:30 | FAC | Kim, Karen | FCES | N | Technical Cleaning |
ONGOING | ONGOING | SAF | LVEA is Laser Hazard | LVEA | Yes | LVEA is Laser HAZARD |
8:30 | 8:50 | CDS | Jonathan | Mechanical Rm | N | CDS Work |
8:30 | 10:00 | FAC | Karen | EY | N | Technical Cleaning |
8:30 | 8:56 | VAC | Jordan | LVEA | Yes | Pump check |
9:00 | 9:15 | SUS | Randy | LVEA | Yes | Inventory Round |
9:02 | 10:41 | SUS | Jason | LVEA | Yes | West Bay FARO Work |
9:06 | 9:24 | SQZ | Preet, Camilla | LVEA | Yes | Change Hartmann Power Supply |
9:09 | 10:41 | SUS | Ryan C | LVEA | Yes | West Bay FARO Work |
9:12 | 11:12 | VAC | Janos | LVEA | Yes | Pump check |
9:15 | 11:03 | SUS | Randy | MX, MY | N | Inventory Round |
9:49 | 10:50 | SQZ | Julian, Camilla | Optics Lab | N | Spare SHG Build |
9:55 | 10:20 | Nutsinee | LVEA | Yes | Table Work | |
9:55 | 10:22 | FAC | Richard | LVEA | Yes | Walkabout |
10:13 | 11:34 | FAC | Kim | EX | No | Technical Cleaning |
10:15 | 11:10 | VAC | Jordan, Gerardo | LVEA | Yes | Climbing on HAM6 |
10:00 | 11:03 | FAC | Karen | LVEA | Yes | Technical Cleaning |
10:30 | 11:10 | SUS | Mitchell | EY, EX | N | Dust Monitor FAMIS Task |
10:54 | ... | SEI | Fil | FCES | N | Seismic Chassis Work |
11:03 | 11:30 | FAC | Karen | Wood Shop | N | Technical Cleaning |
11:30 | 11:42 | FAC | Karen | MY | N | Technical Cleaning |
11:38 | 15:41 | CDS | CDS OUTAGE | CTRL RM | N | CDS OUTAGE |
12:02 | 12:26 | VAC | Janos | LVEA | Yes | Pump check |
12:47 | 13:10 | VAC | Travis | LVEA | Yes | LVEA Laser Safe Transiiton |
13:16 | 14:16 | SQZ | Julian, Camilla | Optics Lab | N | SHG Work |
13:17 | ... | SUS | Randy | LVEA | N | Septum into High-Bay |
13:21 | 13:50 | VAC | Jordan | LVEA | N | HAM6 Gate Valve |
13:21 | 14:26 | VAC | Gerardo | LVEA | N | HAM6 Gate Valve |
13:27 | ... | VAC | Travis | LVEA | N | Relay Tube Assembly |
14:14 | 15:00 | CDS | Jonathan | Mechanical Rm | N | Switching Switches |
14:26 | 15:01 | VAC | Janos | LVEA | N | Pump Check |
14:30 | 14:34 | SUS | Austin | LVEA | N | Parts |