TITLE: 02/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: Maintenance
Wind: 3mph Gusts, 2mph 5min avg
Primary useism: 0.05 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY: Calm morning, prep for HAM8 work today and some cleanup from CDS switch work yesterday.
Current issues:
Corner station HEPI pump controller EPICS IOC does not connect, we suspect network port issue with h1hpipumpctrll0. This is the reason for the 31 disconnected channels on the EDC.
Camera servers will be rebooted today to get all the digital cameras back online.
FMCS connection to the corner station maintenance building and chiller not operational, mech room switch replacement scheduled this morning.