Ops Day Shift Summary

TITLE: 02/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: CDS switch upgrade cleanup finished, corner station high voltage supplies were turned back on, SQZ table work and pumpdown continue.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:22 SAF LVEA is Laser SAFE LVEA NO LVEA is Laser SAFE 03:59
16:02 FAC Karen, Kim FCES n Tech clean 17:11
16:55 CDS Jonathan, Tony, Erik Mech room n FMCS, VAC switch work 18:41
17:04 IAS Jason, Ryan C LVEA - BG n Beam tube surveying 20:56
17:35 - Betsy, Randy, Travis LVEA - W n Clean room and quad container move 18:21
17:35 VAC Jordan EX n RGA 18:41
17:36 VAC Janos LVEA n Checking on turbos 20:54
17:51 OMC Jeff CR n DCPD meas. 18:26
18:22 SQZ Julian, Camilla Opt Lab n SHG work 20:23
18:24 VAC Gerardo, Jordan FCES n Look at purge compressor 19:37
18:27 FAC Kim H2 encl n Tech clean 18:28
19:15 SQZ Nutsinee LVEA - SQZ LOCAL SQZ table work 21:23
19:17 FAC Mitchel EX n Wind fence check 19:52
19:42 VAC Jordan EX n RGA 20:00
20:33 FIT Camilla, Jeff X-arm n Jogging 21:23
21:16 PCAL Tony PCal Lab LOCAL PCal work 21:31
21:21 VAC Jordan EX n RGA 21:40
21:24 EE Fil LVEA n Turn on HV at HAM7 21:48
21:25 IAS Jason, RyanC LVEA n Beam tube surveying 23:25
21:51 SQZ Nutsinee, Daniel, Naoki LVEA - SQZ LOCAL SQZ PMC work Ongoing
22:07 OPS Betsy LVEA n Checking on HAM6 cameras and shutters 22:11
22:11 FAC Randy LVEA n Talk to Jason 23:09
22:19 SQZ Camilla, Julian, Fil Optics Lab LOCAL SHG work 23:36
23:08 VAC Gerardo, Jordan LVEA n Checking purge air at GV5 23:59
23:10 VAC Travis MY n Looking for pump cart 23:36
23:29 CDS Fil FCES, EX, EY n Installing SEI chassis, picking up parts Ongoing