hugh.radkins@LIGO.ORG - posted 16:12, Friday 30 August 2013 (7594)
WHAM6 HEPI Install Update
With the doors on and cleanroom now moved, I've installed all the sensors & electronics.  Quick look at spectra suggest things are OK.  The HEPI is still locked and the Vertical L4-Cs still need to be leveled and protected.  There remains some cable dressing as well.  Please be mindful of the sensors and cables at this location.