With the doors on and cleanroom now moved, I've installed all the sensors & electronics. Quick look at spectra suggest things are OK. The HEPI is still locked and the Vertical L4-Cs still need to be leveled and protected. There remains some cable dressing as well. Please be mindful of the sensors and cables at this location.