Reports until 16:04, Friday 23 February 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:04, Friday 23 February 2024 (75948)
Ops Day Shift End

TITLE: 02/24 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: The light pipe was unshuttered and we now have light in the corner station vacuum. We locked the IMC following the usual wiki instructions, with a restoring of the MCs helping to bring the mode cleaning back to a good state. Work is ongoing to get good light into the OMC for measurements.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:22 SAF LVEA is Laser SAFE LVEA NO LVEA is Laser SAFE 03:59
16:12 FAC Karen, Kim FCES n Tech clean 16:41
16:41 VAC Jordan EX n RGA check 17:03
16:52 FAC Kim LVEA n Tech clean 19:54
16:57 VAC Travis, Jordan LVEA n Relay tube prep 19:54
16:58 - Camilla, Betsy LVEA n HAM6 Camera viewport 17:57
17:16 FAC Randy LVEA n Craning over the tube 17:57
17:48 - Mike Opt Lab n Looking for a place to sit 17:56
17:50 IAS Jason, Ryan C LVEA - BG n Survey work 20:11
17:57 SQZ Nutsinee, Naoki LVEA - SQZ LOCAL Table work 20:11
18:05 PCAL Tony, Dripta Opt Lab local Responsivity meas. 19:35
18:12 SQZ Camilla, Julian Opt Lab local SHG work 20:37
19:54 ISC Vicky, Jenn* CR n OMC scan 21:43
20:49 VAC Travis LVEA n Connect leak check pump cart to relay tube 21:16
20:54 VAC Jordan EX n Check RGA 21:21
21:10 VAC Janos LVEA n Checks 21:17
21:12 SQZ Vicky, Naoki, Nutsinee LVEA - SQZ LOCAL Table work 23:45
21:14 IAS Jason, Ryan C LVEA n Survey ongoing
21:19 SQZ Camilla, Julian Opt Lab local SHG work ongoing
21:36 VAC Travis, Jordan LVEA n Relay tube leak check 22:24
22:21 PCAL Tony, Dripta, Marc EX n Temperature sensor troubleshooting 23:00
22:49 CDS Fernando EX, EY n Oplev hardware install ongoing
22:50 - Mike LVEA n Check on relay tube 22:56
22:57 VAC Travis LVEA n Adjust setpoints for pump cart on relay tube 23:27
23:51 VAC Jordan, Janos EX n Vac check ongoing