Reports until 08:20, Monday 26 February 2024
H1 CAL
anthony.sanchez@LIGO.ORG - posted 08:20, Monday 26 February 2024 (75961)
Monday Morning Ops Shift Start

TITLE: 02/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 10mph Gusts, 8mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.33 μm/s
QUICK SUMMARY:
A number of alarms are alarming:
Type Error While running Test : PSL_NOISE_EATER this is due to a PSL DAC issue.
Dave jumped onto team speak and let me know that we will likely have to swap hardware when Fil arrives.
Vacuum pressure alarm for End X was yellow. H0:VAC-EX_X5_PT526_MOD1_PRESS_TORR.






 

 

Images attached to this report