H1 General
anthony.sanchez@LIGO.ORG - posted 14:32, Monday 26 February 2024 (75971)
Mid Monday Shift update

TITLE: 02/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 30mph Gusts, 24mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.37 μm/s
QUICK SUMMARY:

17:27 4.9 Mag Earthquake from Idaho, trips ISI's but no suspensions.

18:00 UTC PSL gets green light from CDS but the PSL folks say things are still not right.
18:30 UTC the PMC started to work correctly again.

Seismic to calm 19:50 UTC

Monthly test of Hanford system 12:30 - 1 pm

Transition to hazard 12:30 Local time
Out of medium garb

The Combiner was ran down X arm.

Oplev work is still in progress.
HAM6 Camera work is still in progress.
Vacuum System has passed some leak tests and is still pumping down.
 