TITLE: 02/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
The LVEA is Currently in LASER HAZARD.
Japanese Film crew was filming around the site.
Vicki, Swadha, Jenne W. were able to get the OMC locked!
A virbometer for End X was put up on the NUC32 Fom screen so we can keep an eye on it.
Jim is currently running Tranfer functions for HAM8 and will likely pass HAM8 off to the SUS team.
The Vacuum Crew has been running RGA scans and leak tests. No leaks detected. The Gate Valves will remain closed as the VAC teams continue to pump down.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
19:22 | SAF | LVEA is Laser SAFE | LVEA | NO | LVEA is Laser SAFE | 20:28 |
16:38 | VAC | Jordan | End X | No | RGA scans | 17:00 |
16:44 | EE | Fil | CER | N | Fixing PSL DAC hard ware failure. | 17:59 |
16:52 | FAC | Kim & Karen | HAM Shaq | N | Technical cleaning. | 17:22 |
16:54 | 3IFO | Betsy Randy | West bay | No | Craning in the west bay 3IFO repositioning. | 18:54 |
17:09 | VAC | Travis, Gerardo, Janos | LVEA | N | Leak testing the Vacuum system | 19:24 |
17:24 | Fac | Kim & Karen | LVEA | N | technical cleaning | 18:34 |
17:46 | FAC | Tyler | mid stations | N | 3IFO inspection | 19:12 |
17:54 | SQZ | Vicki, Dhruva, Swadha | LVEA | N | LVEA introduction | 18:29 |
18:15 | PSL | Jason, Fil, Ryan | LVEA | N | Working on the PMC | 18:32 |
18:23 | SQZ | Julian, Camilla, Swadha | optics lab | YES | SHG work for SQZ | 20:21 |
18:34 | FAC | Kim | EndX | No | Technical cleaning | 20:04 |
18:35 | FAC | Karen | END Y | N | Technical cleaning | 19:41 |
19:08 | EE | Fernando | LVEA (BS +Y) | No | OPLevers hardware installation. | 20:45 |
19:26 | SQZ | Vicki Swadha | Optic lab | YES | Looking for parts | 19:52 |
19:29 | CAL | Jeff K | Control Rm | No | Measuring OMC electronics | 20:57 |
20:28 | OPS | Austin | LVEA | N | LASER HAZARD Transition | 20:45 |
20:39 | LASER | HAZARD | LVEA | YES | LVEA IS LASER HAZARD WP:11724 | 00:38 |
20:55 | Safety | Tyler & Fire alarm Co | Y-Arm | n | Checking on the Fire alarm System | 21:36 |
21:02 | SQZ | Nutsinee, Naoki , Dhruva | SQZt0 | yes | Opening back panel | 00:51 |
21:09 | EE | Fil | HAM Shaq | No | GS 13 installation on HAM8 | 00:06 |
21:13 | OMC | Vicki, Jenne | Control Rm | N | OMC Alignment. | 23:33 |
21:34 | ENG | Betsy | LVEA (W Bay) | yes | Checking on 3IFO work, and waiting on HAM6 work | 23:04 |
21:43 | Vac | Jordan & Gerardo | LVEA (BSC3) | Yes | Checking Vacuum status | 00:43 |
21:58 | SQZ | Betsy, Robert, Vicki, Swadha, Jenne | LVEA (HAM6) | Yes | HAM6 Camera alignment Party | 23:26 |
22:18 | EE | Marc & Fernado | End X & Y | N | Installing optical lever | 00:07 |
22:22 | FAC | Chris | X arm | No | Combining Tumble Weeds | 00:22 |
23:00 | FMCS | Tyler & Eric | End X | No | Checking on HVAC Fan Virbations. | 23:14 |
23:06 | VAC | Travis | HAM Shaq | N | Vacuum work & RGA | 23:20 |
23:13 | VAC | Jordan | MY, EY | n | RGA checks | 23:30 |
23:27 | SQZ | Dhruva | SQZt0 | Yes | SQZing adjustments | 23:31 |