Reports until 16:09, Monday 26 February 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:09, Monday 26 February 2024 (75976)
Monday Ops Shift End

TITLE: 02/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
The LVEA is Currently in LASER HAZARD.
Japanese Film crew was filming around the site.
Vicki, Swadha, Jenne W. were able to get the OMC locked!
A virbometer for End X was put up on the NUC32 Fom screen so we can keep an eye on it.
Jim is currently running Tranfer functions for HAM8 and will likely pass HAM8 off to the SUS team.
The Vacuum Crew has been running RGA scans and leak tests. No leaks detected. The Gate Valves will remain closed as the VAC teams continue to pump down.

 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:22 SAF LVEA is Laser SAFE LVEA NO LVEA is Laser SAFE 20:28
16:38 VAC Jordan End X No RGA scans 17:00
16:44 EE Fil CER N Fixing PSL DAC hard ware failure. 17:59
16:52 FAC Kim & Karen HAM Shaq N Technical cleaning. 17:22
16:54 3IFO Betsy Randy West bay No Craning in the west bay 3IFO repositioning. 18:54
17:09 VAC Travis, Gerardo, Janos LVEA N Leak testing the Vacuum system 19:24
17:24 Fac Kim & Karen LVEA N technical cleaning 18:34
17:46 FAC Tyler mid stations N 3IFO inspection 19:12
17:54 SQZ Vicki, Dhruva, Swadha LVEA N LVEA introduction 18:29
18:15 PSL Jason, Fil, Ryan LVEA N Working on the PMC 18:32
18:23 SQZ Julian, Camilla, Swadha optics lab YES SHG work for SQZ 20:21
18:34 FAC Kim EndX No Technical cleaning 20:04
18:35 FAC Karen END Y N Technical cleaning 19:41
19:08 EE Fernando LVEA (BS +Y) No OPLevers hardware installation. 20:45
19:26 SQZ Vicki Swadha Optic lab YES Looking for parts 19:52
19:29 CAL Jeff K Control Rm No Measuring OMC electronics 20:57
20:28 OPS Austin LVEA N LASER HAZARD Transition 20:45
20:39 LASER HAZARD LVEA YES LVEA IS LASER HAZARD WP:11724 00:38
20:55 Safety Tyler & Fire alarm Co Y-Arm n Checking on the Fire alarm System 21:36
21:02 SQZ Nutsinee, Naoki , Dhruva SQZt0 yes Opening back panel 00:51
21:09 EE Fil HAM Shaq No GS 13 installation on HAM8 00:06
21:13 OMC Vicki, Jenne Control Rm N OMC Alignment. 23:33
21:34 ENG Betsy LVEA (W Bay) yes Checking on 3IFO work, and waiting on HAM6  work 23:04
21:43 Vac Jordan & Gerardo LVEA (BSC3) Yes Checking Vacuum status 00:43
21:58 SQZ Betsy, Robert, Vicki, Swadha, Jenne LVEA (HAM6) Yes HAM6 Camera alignment Party 23:26
22:18 EE Marc & Fernado End X & Y N Installing optical lever 00:07
22:22 FAC Chris X arm No Combining Tumble Weeds 00:22
23:00 FMCS Tyler & Eric End X No Checking on HVAC Fan Virbations. 23:14
23:06 VAC Travis HAM Shaq N Vacuum work & RGA 23:20
23:13 VAC Jordan MY, EY n RGA checks 23:30
23:27 SQZ Dhruva SQZt0 Yes SQZing adjustments 23:31