H1 General
anthony.sanchez@LIGO.ORG - posted 08:17, Tuesday 27 February 2024 (75984)
Tuesday Ops shift morning report.

TITLE: 02/27 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 5mph Gusts, 3mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.34 μm/s
QUICK SUMMARY:

LVEA is still in LASER HAZARD
CDS Looks good
Temperatures in the LVEA Zone 4 look to be leveling out well at 67C

Today's Expected work:
HAM8 finish work and close up
More Vacuum Leak Checks and RGA scans
Possibly some OPLEV work.


 