TITLE: 02/27 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 14mph Gusts, 11mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.24 μm/s
QUICK SUMMARY:
Rahul, has completed the Tranfer Functions, and Fil has completed the grounding loop tests on HAM8.
The HAM8 Door crew has been assembled in the HAM Shaq to start putting the HAM8 door back on.
PSL Ref Cav Alignment is complete and the PSL Team is out of the PSL enclosure.
The SQZ Team no longer needs the LVEA to be Laser hazard.