Reports until 16:20, Tuesday 27 February 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:20, Tuesday 27 February 2024 (76010)
Tuesday OPS End Shift Report.


TITLE: 02/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
The LVEA is now LASER SAFE.
The HAM8 Door is back on.
The SQZ team has finished with the SQZT7 table work that they needed to do. They still need to take some transfer functions though.
Dave got the Locking Cameras working again.
TCS team has said that they are done.
Vacuum team is currently in the HAM Shaq starting the Pump Down!



LOG:

Start Time System Name Location Lazer_Haz Task Time End
20:39 LASER HAZARD LVEA YES LVEA IS LASER HAZARD WP:11724 23:28
16:06 Vac Jordan End X No RGA scans 16:22
16:20 TCS Camilla LVEA Yes Turning on heartman laser 16:50
16:21 SUS Rahul Remote N Sus transfer function 16:53
16:25 fac Kim & Karen HAM Shaq N Technical cleaning 17:11
16:30 VAC Jordan CER Output Tube yes RGA scans 17:27
16:35 fac Tyler Chris Eric HAM Shaq N Tumbleweed removal 19:35
16:39 PSL Ryan S Control Rm No PMC Alignment 17:58
16:54 SUS Rahul Remote/EY N testing OPLEVs & Running TF on EY 18:44
17:01 TCS TJ, Camilla CR n TCSX ITMX realign with HWS 19:17
17:02 EE Fil HAM8 -> EX No ground Loop Measurements 18:59
17:10 PSL Jason & Ryan S PSL Room YES REF Cav Alignment 19:52
17:25 EE Fernando LVEA (BS) YES OPLEV work 20:25
17:29 Disposal Christina Overpass & Water tank N Forklifting & driving 1ton for recycling/Disposal 19:29
17:31 3IFO Randy & Betsy LVEA West Bay Yes Moving 3IFO Equipment 19:09
17:38 FAC Kim & Karen LVEA Yes Technical Cleaning 18:26
17:53 SQZ Dhruva Nutsine SQZT7 Yes Touching up SQZ Table Alignment 18:02
18:28 FAC Karen MY No Technical Cleaning 19:35
18:32 FAC Tyler Mech Room AH1 No Swaping parts 20:59
18:59 VAC Jordan LVEA Yes RGA Scans on HAM6 19:31
19:29 TCS TJ, Camilla LVEA Yes Giggling cables 22:05
19:49 CDS Dave Barker EY N ALSY Camera Checks 20:35
20:04 HWC Jeff EY No Health & Wellness running Activities! 20:55
20:07 OMC Jenne W Control Rm N aligning OMC needs IMC Locked 21:39
20:41 VAC Travis, Jordan, Gerardo HAM Shaq N Putting Doors back on HAM8 23:30
20:45 SQZ Dhruva, Swadha, Nutsine SQZT7 YES Aligning FTC 21:27
20:48 VAC Jordan LVEA East bay N Grabbing parts 20:51
21:52 SAF Tony LVEA Yes Transitioning to Laser SAFE 23:27
22:12 PEM Camilla & Preet LVEA Roof No Checking Weather on Roof 22:22
22:22 OMC Jenne W, Keita Control Rm No Touching up alignment of OMC and SR2 00:22
23:29 SAFETY LASER SAFE LVEA NO The LVEA is LASER SAFER 23:29
23:31 VAC Gerardo Jordan HAM8 No HAM8 Pump Down 01:31
23:43 TSC Camilla Control Rm N TSC rotation stage adjustments 00:28
23:43 CDS Erik CER N Checking on CDS Machines 01:43