Displaying report 1-1 of 1.
Reports until 08:12, Wednesday 28 February 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 08:12, Wednesday 28 February 2024 (76022)
Wed Morning Ops report

TITLE: 02/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 54mph Gusts, 38mph 5min avg
    Primary useism: 0.11 μm/s
    Secondary useism: 0.29 μm/s
QUICK SUMMARY:
Tumbleweeds are on the move.
CDS Looks good
HAM 7 watchdog was tripped, I untripped it.

Expected work:
VAC team is going to be doing RGA scans on HAM7 and Pumping down HAM8.
SQZ team may start doing transferfunctions.

 

Displaying report 1-1 of 1.