Cabling for the HEPI Pump Controller Beckhoff upgrade completed. Network and power cables pulled from the mechanical mezzanine, over the bridge pipe, to BSC2. Upgrade not scheduled until after the 04 run. Modifications of control panels for the motor readback signals have not been completed.