Displaying report 1-1 of 1.
Reports until 10:03, Thursday 29 February 2024
H1 PSL
ryan.short@LIGO.ORG - posted 10:03, Thursday 29 February 2024 (76046)
PSL Rotation Stage Calibration

Following our PSL work on Tuesday (alog76002) during which the PMC alignment and output power changed, I took the opportunity this morning to recalibrate the PSL rotation stage.

Since there have been slow controls restarts in the past weeks, the rotation stage settings had been reset, so I started by putting those back according to trends. The rest of the process went as follows:

  Power in (W) D B (Minimum power angle) C (Minimum power)
Old Values 102.941 1.990 -24.803 0.000
New Values 103.151 1.990 -24.823

0.000

Images attached to this report
Non-image files attached to this report
Displaying report 1-1 of 1.