Reports until 16:12, Thursday 29 February 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:12, Thursday 29 February 2024 (76060)
Ops Day Shift End

TITLE: 02/29 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:  Lots of work going on around the site - single bounce alignment, RGA heating, lights, and much more.
LOG:                                

Start Time System Name Location Lazer_Haz Task Time End
23:29 SAFETY LASER SAFE LVEA NO The LVEA is LASER SAFER -
16:01 FAC Ken OSB n Emergency lighting replacement in vestibules 18:40
16:19 FAC Chris LVEA n Machine maintenance - check on batteries, pivots, etc 19:15
16:19 VAC Jordan LVEA n HAM7 RGA bakeout adjust 16:23
16:24 VAC Jordan EX n RGA bakeout adjust 17:10
16:27 FAC Eric MX n Installing SCRs for heater coils 18:35
16:34 PCAL Tony, Julian, Francisco Opt Lab local PCAL meas in lab 16:35
16:42 - Michael, Robert, Richard LVEA, Mech room n HVAC seismic study 19:29
16:43 PCAL Tony, Julian, Francisco EX YES PCAL meas. 19:24
16:45 TCS Camilla LVEA n Check on CO2X 16:54
16:54 PSL/IMC Ryan S CR n PSL rot stage calibration and IMC WFS centering 17:34
17:12 VAC Jordan FCES n HAM8 Pumpdown and RGA bake check 18:45
17:26 - Randy, Jim LVEA - W n Crane and move cleanroom 18:52
17:30 FAC Karen, Kim Opt. Lab, LVEA n Tech clean 18:33
17:38 ISC Jenny CR n OMC single bounce meas 20:34
18:19 IAS Jason, Ryan S LVEA BG n Surveying BSC2 19:39
18:32 CDS Fil EY n Cables around chamber 20:02
18:33 FAC Kim H2 building n Tech clean 18:49
18:36 FAC Eric MY n Installing SRCs for heater coils 21:43
18:40 FAC Ken EY n EY mech room lights 20:20
18:49 VAC Jordan LVEA n HAM7 RGA heater step 18:58
18:51 HWS Camilla, Preet EX, EY - Taking pictures and measurements 19:59
19:16 FAC Chris FCES n Mechanical maintenance 21:05
19:37 PCAL Tony Opt Lab local PCAL meas 20:02
19:38 VAC Gerardo FCES n Leak checking HAM8 22:49
19:45 - Betsy, Mitchell LVAE n Add labels and plan 21:06
20:10 - Marc, tour LVEA n Tour 21:33
20:22 FAC Ken EX n Lights in mech room 21:36
20:37 CDS Fil EX n Cables around chamber 22:51
21:13 CDS Dave EY, EX n Camera work 22:14
21:14 - Robert, Michael LVEA n HVAC seismic study ongoing
21:14 SEI Jim LVEA n Unlock HAM5,6 HEPI 22:51
21:15 VAC Jordan LVEA n RGA heater step 22:49
21:36 FAC Ken Mech room n Lights 23:23
21:44 VAC Janos LVEA n Check on vac system 22:49
21:45 SQZ Dhruva, Nutsinee, Swadha LVEA - SQZ n Plugging into sqz racks 22:40
22:43 FAC Tyler arms n Checking on tumbleweeds 23:02
22:45 OpLev Jason LVEA n Check on ITMY OpLev 23:45
22:49 SQZ Nutsinee LVEA n Check on SQZ 23:49
22:51 ISC Jenny CR n Single bounce aligning ongoing
23:07 PCAL Tony, Francisco OptLab local PCAL meas ongoing
23:15 SQZ Camilla, Julian, Swadha OptLab local SHG work ongoing
23:53 VAC Jordan FCES n HAM8 RGA heater step 00:07
23:59 Oplev Jason, Fil LVEA n Walking the oplev lines ongoing