TITLE: 02/29 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Lots of work going on around the site - single bounce alignment, RGA heating, lights, and much more.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:29 | SAFETY | LASER SAFE | LVEA | NO | The LVEA is LASER SAFER | - |
16:01 | FAC | Ken | OSB | n | Emergency lighting replacement in vestibules | 18:40 |
16:19 | FAC | Chris | LVEA | n | Machine maintenance - check on batteries, pivots, etc | 19:15 |
16:19 | VAC | Jordan | LVEA | n | HAM7 RGA bakeout adjust | 16:23 |
16:24 | VAC | Jordan | EX | n | RGA bakeout adjust | 17:10 |
16:27 | FAC | Eric | MX | n | Installing SCRs for heater coils | 18:35 |
16:34 | PCAL | Tony, Julian, Francisco | Opt Lab | local | PCAL meas in lab | 16:35 |
16:42 | - | Michael, Robert, Richard | LVEA, Mech room | n | HVAC seismic study | 19:29 |
16:43 | PCAL | Tony, Julian, Francisco | EX | YES | PCAL meas. | 19:24 |
16:45 | TCS | Camilla | LVEA | n | Check on CO2X | 16:54 |
16:54 | PSL/IMC | Ryan S | CR | n | PSL rot stage calibration and IMC WFS centering | 17:34 |
17:12 | VAC | Jordan | FCES | n | HAM8 Pumpdown and RGA bake check | 18:45 |
17:26 | - | Randy, Jim | LVEA - W | n | Crane and move cleanroom | 18:52 |
17:30 | FAC | Karen, Kim | Opt. Lab, LVEA | n | Tech clean | 18:33 |
17:38 | ISC | Jenny | CR | n | OMC single bounce meas | 20:34 |
18:19 | IAS | Jason, Ryan S | LVEA BG | n | Surveying BSC2 | 19:39 |
18:32 | CDS | Fil | EY | n | Cables around chamber | 20:02 |
18:33 | FAC | Kim | H2 building | n | Tech clean | 18:49 |
18:36 | FAC | Eric | MY | n | Installing SRCs for heater coils | 21:43 |
18:40 | FAC | Ken | EY | n | EY mech room lights | 20:20 |
18:49 | VAC | Jordan | LVEA | n | HAM7 RGA heater step | 18:58 |
18:51 | HWS | Camilla, Preet | EX, EY | - | Taking pictures and measurements | 19:59 |
19:16 | FAC | Chris | FCES | n | Mechanical maintenance | 21:05 |
19:37 | PCAL | Tony | Opt Lab | local | PCAL meas | 20:02 |
19:38 | VAC | Gerardo | FCES | n | Leak checking HAM8 | 22:49 |
19:45 | - | Betsy, Mitchell | LVAE | n | Add labels and plan | 21:06 |
20:10 | - | Marc, tour | LVEA | n | Tour | 21:33 |
20:22 | FAC | Ken | EX | n | Lights in mech room | 21:36 |
20:37 | CDS | Fil | EX | n | Cables around chamber | 22:51 |
21:13 | CDS | Dave | EY, EX | n | Camera work | 22:14 |
21:14 | - | Robert, Michael | LVEA | n | HVAC seismic study | ongoing |
21:14 | SEI | Jim | LVEA | n | Unlock HAM5,6 HEPI | 22:51 |
21:15 | VAC | Jordan | LVEA | n | RGA heater step | 22:49 |
21:36 | FAC | Ken | Mech room | n | Lights | 23:23 |
21:44 | VAC | Janos | LVEA | n | Check on vac system | 22:49 |
21:45 | SQZ | Dhruva, Nutsinee, Swadha | LVEA - SQZ | n | Plugging into sqz racks | 22:40 |
22:43 | FAC | Tyler | arms | n | Checking on tumbleweeds | 23:02 |
22:45 | OpLev | Jason | LVEA | n | Check on ITMY OpLev | 23:45 |
22:49 | SQZ | Nutsinee | LVEA | n | Check on SQZ | 23:49 |
22:51 | ISC | Jenny | CR | n | Single bounce aligning | ongoing |
23:07 | PCAL | Tony, Francisco | OptLab | local | PCAL meas | ongoing |
23:15 | SQZ | Camilla, Julian, Swadha | OptLab | local | SHG work | ongoing |
23:53 | VAC | Jordan | FCES | n | HAM8 RGA heater step | 00:07 |
23:59 | Oplev | Jason, Fil | LVEA | n | Walking the oplev lines | ongoing |