TITLE: 03/01 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 29mph Gusts, 19mph 5min avg
Primary useism: 0.07 μm/s
Secondary useism: 0.52 μm/s
QUICK SUMMARY:
More PEM work slated today along with more potential OMC and SQZ work for early commissioning