TITLE: 03/01 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
OMC measurements ongoing. RGA work throughout site today. Gate valves set to open Monday morning.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:29 | SAFETY | LASER SAFE | LVEA | N | The LVEA is LASER SAFE | 03:14 |
16:05 | FAC | Tyler | MY | N | Fire antenna upgrade | 17:34 |
16:14 | FAC | Karen/Kim | LVEA | N | Tech clean | 16:50 |
16:46 | SEI | Jim | Remote | N | ISI HAM 8 measurements | ?? |
16:56 | TCS | Camilla | LVEA | N | Look for parts | 17:22 |
17:02 | VAC | Jordan | HAM 7 | N | Increase HAM 7 RGA | 18:28 |
17:03 | FAC | Randy | W Bay | N | Craning | 17:41 |
17:42 | PCAL | Tony/Julian | PCAL Lab | Y | Measurements | 17:59 |
17:45 | PEM | Robert/Michael | LVEA | N | PEM checks | ?? |
18:47 | VAC | Gerardo/Jordan | EX | N | RGA scans | 20:34 |
18:54 | FAC | Randy | EY/EX | N | Boom lift for cameras | 20:54 |
19:00 | PCAL | Tony | PCAL Lab | Y (LOCAL) | Measurement | 20:46 |
19:01 | HWS | Camilla/Georgia/Craig/Swadha/Julian | Optics Lab | Y (LOCAL) | Measurement | 20:28 |
19:03 | SQZ | Nutsinee/Dhruva/Naoki | SQZT0 | Y (LOCAL) | SQZ work | 20:24 |
19:11 | PEM | Robert/Michael | MY/EY | N | PEM measurements | ?? |
19:33 | ISC | Sheila/Elenna/Jennie | CR | N | OMC alignment | ?? |
19:35 | OpLev | Fernando | LVEA/EX/EY | N | OpLev chassis work | 22:49 |
21:05 | SQZ | Dhruva/Camilla | SQZ tables | N | Clean up | 21:19 |
21:13 | VAC | Jordan | HAM 7 | N | Turn up RGA | 21:21 |
21:20 | SUS | Rahul | CR | N | HAM 7 TF health checks | 21:50 |
21:30 | FAC | Mitch | LVEA | N | Grab serial numbers | 21:38 |
21:58 | SQZ | Nutsinee | SQZT0 | Y (LOCAL) | SQZ work | 22:15 |
22:08 | VAC | Jordan/Gerardo | EX | N | Turn on ion pump | 22:59 |
22:11 | SQZ | Camilla/Julian/Dhruva | HAM Shack | N | Move sqz table | 22:59 |
23:00 | VAC | VAC team | LVEA - GV7 | N | Annulus ion pump work | 23:43 |
23:06 | SQZ | Dhruva/Nutsinee | CER | N | Cabling | 23:52 |
23:51 | PCAL | Tony | PCAL Lab | Y (LOCAL) | LLO sphere measurement | ?? |