michael.rodruck@LIGO.ORG - posted 10:42, Wednesday 27 April 2011 (761)
H2 PSL installation
HVAC guys installed the make up air fan in the return air plenum, as well as the flexible connections for the ducting. More finshing work done on the exterior and interior drywall.