TITLE: 03/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 2mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.12 μm/s
QUICK SUMMARY:
Erik and Dave recover the DC0
Erik and Dave replace front End Computer for HAM8 SEI
IMC Lock Node in Error 17:09 UTC
PSL Enclosure temperatures
Landscapers came by to land scape
Guardian reboot at 17:35 UTC and is back at 17:40 UTC
Austin took some PR2 & MC2 TF
PSL Dust alarm 17:55 UTC
Gate Valve GV7 is now OPEN! Thank you Vacuum team.
Please Start Checking your Sub System's SDF Diffs.
I will start the baffle align script and Start trying to get ALS X going while the VAC team gets the last Gate Valve opened.