Displaying report 1-1 of 1.
Reports until 16:54, Tuesday 05 March 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:54, Tuesday 05 March 2024 (76133)
Tuesday OPS End Shift Report.

TITLE: 03/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 8mph Gusts, 6mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.11 μm/s
QUICK SUMMARY:

Since Lunch time the control room has been enthralled with trying to relock H1 for the first time since Jan16th!
FIlter Tube Cavity is still closed.

LOCKING Notes:
TMS Alignment was tampered with before we realized that the Shutters were closed.
Using Camilla's alog with instructions on dithering alog 62024.
ALS Trouble Shooting before running TMS ITM and ETM Baffle Scripts.
ITMY Baffle PD4 was "Broken?"
Got light onto ETMY Baffle 1 and turned OFF the offsets to bring the light back to center then realigned ETMY via Guardian.

TMSX Baffle align script worked fine.
ITMX Baffle align Script failed to find any light.
But we didn't notice this and continued onto ETMX Baffle Align  which found light.
Unfortunately this was NOT ALS light that we saw on ETMX. Sheila and I decided to Shutter ALS and the light we found on ETMX Baffle 1 did not go away when shuttering ALS shutter on X arm.
Troubleshooting ALS X some more: We then used the Oplevs from January to find a good spot to take ETMX. 
First Light on ASLX 22:44 UTC
TroubleShooting PLL Problems that are making the X arm hard to lock. Eventually I got the ALSX beam spot looking as good as I could and then paused while Ryan S checked out the PLL.
Ryan S found out that the Beckhoff reboot turned off ALSX fiber Servo compensation. Checking out the SDF there was a dead give away that the problem was caused by a Beckhoff reboot. The date of the Change was Sun Dec 31 16:00:00 1989 which was the big clue.

DigiVideo3 Needed to be rebooted again.

Technical Notes:

ETMX Oplev positions AFTER we have good ALSX beam Spot:
H1:SUS-ETMX_L3_OPLEV_PIT_OUTPUT = -5
H1:SUS-ETMX_L3_OPLEV_YAW_OUTPUT = -12

ITMX Oplev positions AFTER we have good ALSX beam Spot:
H1:SUS-ITMX_L3_OPLEV_PIT_OUTPUT = -7
H1:SUS-ITMX_L3_OPLEV_YAW_OUTPUT = -1

ETMY Oplev positions AFTER we have good ALSY beam Spot:
H1:SUS-ETMY_L3_OPLEV_PIT_OUTPUT = -16
H1:SUS-ETMY_L3_OPLEV_YAW_OUTPUT = -13

ITMY Oplev positions AFTER we have good ALSY beam Spot:
H1:SUS-ITMY_L3_OPLEV_PIT_OUTPUT = -13
H1:SUS-ITMY_L3_OPLEV_YAW_OUTPUT = 9

Comm Beat note: 1.5
Diff beatnote : -14

The Beam splitter was touched up as well.
BeamSplitter Oplevs as they currently Stand:
H1:SUS-BS_M3_OPLEV_PIT_OUTPUT = 7
H1:SUS-BS_M3_OPLEV_YAW_OUTPUT = -9

Dark offsets by hand , for AS_C.

PR2 and IM4 were just touched up and then did Dark Offsets by hand for POP 45.
PR2  Witness sensors positions:
H1:SUS-PR2_M3_WIT_LMON = -29
H1:SUS-PR2_M3_WIT_PMON = 614

IM4 Witness Sensors postions:
H1:SUS-IM4_M1_DAMP_L_INMON = -41
H1:SUS-IM4_M1_DAMP_P_INMON =-2803


X ARM Sensor Correction has been turned off the Entire time due to Jim's BRS being rung up by him working on it.

Input Align Offloaded Successfully!!!
PRC_ALIGN OFFLOADED!!!
MICH_BRIGHT OFFLOADED!!!
INITIAL_ALIGNMENT COMPLETE!!!

                                                                                                                                 

Start Time System Name Location Lazer_Haz Task Time End
23:29 SAF LASER SAFE LVEA - The LVEA is LASER SAFE 03:14
16:03 FAC Karen LVEA N Technical Cleaning 18:15
16:04 Beckhoff Daniel Remotely N Slow controls. 17:19
16:05 CDS Dave & Erik MSR N Recovering DC0 17:12
16:06 EE Ken LVEA HighBay N Lamp replacement 20:06
16:18 EE Fernando LVEA Beckhoff slow controls work 18:18
16:26 FAC Chris & Pest Con LVEA N Pest control with pest control 17:21
16:29 FAC Randy LVEA West N Craning in the West bay. 18:08
16:36 FAC Mitchel EX N Taking Picts to document Wind Fence work 17:00
16:53 EE Fil LVEA N Measureing Cable tray lengths in the LVEA. 20:53
17:03 Contractor ACE EY N Effluent removal 19:03
17:10 FAC Ken FTCE N Getting lift taking to LVEA High bay 19:36
17:11 FAC Mitchell EX N Pulling Camera 19:48
17:12 CDS Erik HAM Shaq n moving compters 17:32
17:16 FAC Christina Water Tower and Overpass N Forklifting recycling OSB Receiving 18:46
17:20 PSL Sheila , Trent, Matt LVEA N Turning on side bands 17:29
17:21 FAC Kim EX N Technical cleaning 18:51
17:25 SEI Jim Mitchel EX N Camera removal 18:45
17:50 SUS Austin Control Rm N PR2 & MC2 TF 18:47
18:07 FAC Tyler Mid Y N Bearing Inventory 18:20
18:15 VAC Janos EX N OPENING GATE VALVE!!! 19:05
18:16 FAC Karen EY N Technical Cleaning 18:59
18:52 CDS Jonathan Mike & tour Roof N Tour going to the Roof. 19:00
19:01 FAC Kim Mid X N Technical Cleaning 19:50
19:06 VAC Janos LVEA n OPENING LVEA GATE VALVES!!!! 21:01
19:47 VAC Gabriel Alena LVEA N Taking Pictures Elena back First 20:15
20:31 Camera McCarthy End X N Installing PZT Camera 21:26
20:45 SEI Jim EndX N BRS Work 21:27
20:58 FAC Eric Mid Y Mid X N Running pumps 21:36
21:15 FAC Tyler chris X arm N Tumbleweeding wit Big Green 23:15
21:24 Dust Ryan C LVEA N Dust Mon Check 21:40
21:58 CDS Marc MY - Inventory 22:41
22:05 SQZ Nutsinee Nioki SQZT0 Local SQZr Work , Nioki out early 01:05
22:16 VAC Jordan FCES - HAM8 RGA 23:16
22:50 EE Marc & Daniel Mid Y N Beckhoff mid Y 00:50
23:29 VAC Jordan Gerado LVEA N turbo pumps turning off 23:53
Images attached to this report
Displaying report 1-1 of 1.