TITLE: 03/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
Locking troubleshooting continues. The commissioning team was able to get to PREP ASC before losing lock, so good progess is being made. Alog on today's locking extravaganza here.
Last shift from me, peace out yall :)
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:29 | SAF | LASER SAFE | LVEA | - | The LVEA is LASER SAFE | 03:14 |
16:00 | FAC | Ken | High Bay | N | Lighting | ?? |
16:09 | FAC | Karen/Kim | LVEA | N | Tech clean (Kim out 1646) | 17:26 |
17:05 | VAC | Jordan | HAM 8 | N | RGA prep | 17:33 |
17:15 | Hanford Fire | Site | Tumbleweed burn | ?? | ||
17:47 | SEI | Jim | Remote | N | Restart BRS X | ?? |
18:25 | FAC | Karen | MY | N | Technical cleaning | 19:11 |
18:48 | VAC | Travis/Janos | LVEA | N | Turbo pump water line work | 20:32 |
19:12 | ISC | Sheila/Matt/Trent | ISCT1 | YEYE (LOCAL) | Beam dump installation | 19:46 |
20:33 | VAC | Gerardo, Jordan | LVEA | N | Climbing on HAM6 for turbopump | 21:33 |
21:59 | VAC | Jordan | HAM 8 | N | RGA scans | 23:25 |
22:08 | VAC | Janos | HAM 7 | N | Annulus ion pump work | 22:20 |
22:46 | VAC | Travis | LVEA | N | Disconnect pump cart | 23:12 |