The pressures: HAM7: ~2.9E-7 Torr HAM8: ~3.3E-7 Torr Corner: ~4.9E-8 Torr EX: ~5.4E-9 Torr Today's activities: - The X-manifold turbo-station water lines have been updated - now the controller and pump lines are separated - HAM8 RGA scan is done, details in the comments - HAM8 IP was valved in - HAM7 Annulus Ion Pump has railed; it is caused supposedly by a leaky plug on the septum plate, or just the AIP controller - either way, it will be found out soon - Relay tube - HAM7 - HAM8 further schedule: This volume will be valved in to the main volume around the end of the week - RV1; FCV1; FCV2; FCV3; FCV4; FCV8; FCV9 will be opened; preferably after the HAM7 AIP issue is solved
HAM8 scans collected at T240018
RGA tree was baked at 150C for 5 days following the replacement of leaking calibrated leak with a blank.