TITLE: 03/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 3mph Gusts, 1mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.15 μm/s
QUICK SUMMARY:
Arrived with Sheila & Gabriele running an Manual Initial Alignmnent. Randy and Eric are moving items around the site as well. Low winds currently and a couple of earthquakes over night (5 & 7hrs ago). No alarms or major red-ness on the CDS Overview.
Whoopps--missed this: Sheila let me know that on DIAG MAIN there is a notification of "Check PSL Chiller." (RyanC messaged Jason)
[Additionally there is a notification for SEI_CONF "being stuck", but Sheila mentioned work by Jim yesterday (i.e. EX BRS).]
I looked at the PSL chiller this morning and the water level was hovering right above the minimum fill line (this is the most common reason for the "check PSL chiller" message on DAIG_MAIN), so I added 150mL of lab water.