(Corey, Eric, Jim)
HAMISI#3 Status
Installed the large Walls & Flexure Walls on the Assembly, installed and ran all cabling, checked level and balanced the ISI. Via the Dial Indicators, the level was good to within 0.001". An Unlock/Lock check also saw the Dial Indicators stay within 0.001".
Shims used for Lockers:
For all intents and purposes, this ISI is ready to hand off to Vincent for testing. What's left: Get Test Stand up & running (Richard and crew?), Use new BSC/HAM Feedthru Interface, set gaps on Sensors, and then start testing this HAM.