H1 General
oli.patane@LIGO.ORG - posted 16:02, Friday 08 March 2024 (76216)
Ops Day Shift End

TITLE: 03/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Currently in OMC_WHITENING damping violins before turning on whitening
LOG:

16:00UTC Start of shift, in Manual Initial Alignment
17:00 Having trouble with FIND_IR for YARM, closed ISI ETMY excitation (looked like nothing in exc channel anyway)
17:17 Took detector to DOWN
18:04 Started relocking
18:45 Lockloss from DARM_TO_RF
18:59 Lockloss from DARM_TO_RF
19:22 Initial Alignment done, relocking
19:31 Lockloss from DARM_TO_RF again
20:18 Lockloss from DARM_TO_DC_READOUT
20:53 Lockloss from DARM_TO_DC_READOUT
21:21 Lockloss from RESONANCE
21:33 Lockloss from CARM_TO_REFL, starting INITIAL_ALIGNMENT
22:16 Finished INITIAL_ALIGNMENT, relocking
23:14 Reached OMC_WHITENING!                    

Start Time System Name Location Lazer_Haz Task Time End
23:29 SAF LASER SAFE LVEA - The LVEA is LASER SAFE 21:35
16:38 FAC Tyler EY n Escorting truck to pick up boom lift 17:10
17:18 VAC Travis, Jordan, Gerardo LVEA - HAM7 n Friday vacuum party (Jordan, Travis out) 17:52
17:43 FAC Chris MX n Safety checks 19:27
17:48   Julian Optics lab yes(local) Working on SHG 19:34
17:55 FAC Tyler HAM Shack n Dropping parts off 18:09
18:43 VAC Travis, Janos LVEA n Opening relay tubes 19:04
21:35 VAC Travis HAM Shack n Disconnecting pump carts 22:17
23:31 SQZ Nutsinee HAM Shack n SQZT8 table alignment 01:31
23:36   Gabriele arms n running 01:36