Cabling on the HAM5 D3 flange was redressed. Cables routed behind the cross beam. This required cables for the HAM5 DCPD and the OFI TEC/THERMISTORS to be disconnected. D. Sigg disabled the servo for the OFI TEC. Servo enabled after cable work was completed.