Reports until 16:03, Wednesday 13 March 2024
LHO General
ryan.short@LIGO.ORG - posted 16:03, Wednesday 13 March 2024 (76320)
Ops Day Shift Summary

TITLE: 03/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Lots of good commissioning time today since H1 was locked all day (current lock stretch up to 14 hours).

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:53 FAC Mitchell LVEA - Pictures of HAM6 15:59
15:57 SAF HFD X-arm - Controlled tumbleweed burns 20:54
16:53 SQZ Nutsinee LVEA - TF at SQZ racks 17:06
17:02 FAC Karen Opt Lab - Technical cleaning 17:21
19:38 CDS Fil MX - Troubleshooting access cameras 20:38
21:06 FAC Tyler X-arm - Checking burn progress 21:17
22:49 FIT Gabriele Arms - Running Ongoing